[Digestion] Digestion Digest, Vol 7, Issue 3
Vishwas Gokhale
g_vishwas at vsnl.com
Sat Jan 13 23:54:04 CST 2007
Dear Donna,
If you want to experiment with high pressure digestion system may be you can
work with number of digesters working in parallel. It seems nobody has
studied anaerobic digestion at higher pressures. It would however be
necessary to install a safety vent system for pressures beyond acceptable
levels .
We may get much better results. Maybe we may get crude oil out of
this digesters. That is how the natural gas is produced in the first place.
Vishwas Gokhale
Principal Consultant
GIT Associates
1034/2/B, 6, Annapurna
Model Colony, Pune 411016, India
Phone:- 091 20 25651405, Mobile:- +919822604274
Web:- http://www.gitassociates.com
-----Original Message-----
From: digestion-bounces at listserv.repp.org
[mailto:digestion-bounces at listserv.repp.org] On Behalf Of
digestion-request at listserv.repp.org
Sent: 13 January 2007 23:30
To: digestion at listserv.repp.org
Subject: Digestion Digest, Vol 7, Issue 3
Send Digestion mailing list submissions to
digestion at listserv.repp.org
To subscribe or unsubscribe via the World Wide Web, visit
http://listserv.repp.org/mailman/listinfo/digestion_listserv.repp.org
or, via email, send a message with subject or body 'help' to
digestion-request at listserv.repp.org
You can reach the person managing the list at
digestion-owner at listserv.repp.org
When replying, please edit your Subject line so it is more specific
than "Re: Contents of Digestion digest..."
Today's Topics:
1. Re: Digestion Digest, Vol 7, Issue 2 (Donna Soroka)
----------------------------------------------------------------------
Message: 1
Date: Fri, 12 Jan 2007 23:43:08 -0800 (PST)
From: Donna Soroka <horses3dog1 at yahoo.com>
Subject: Re: [Digestion] Digestion Digest, Vol 7, Issue 2
To: digestion at listserv.repp.org
Message-ID: <20070113074308.45745.qmail at web30508.mail.mud.yahoo.com>
Content-Type: text/plain; charset=iso-8859-1
>Dear Saroka,
you can use the floating dome of biogas plant, as a storage for the gas. In
this mode, the digester is filled with water. Introduce the gas into the
dome through the gas cock fitted at the top of the dome, which gets lifted
out of the water as it gets filled with gas. Close the cock when the dome is
full of gas and connect the gas cock to the gas burner. The weight of the
floating dome is generally enough to drive the gas to the burner. If the
weight of the floating dome is not enough to produce the necessary pressure,
you can place additional weights of the dome to create extra pressure. You
may have to remove the extra weights when filling your gas holder. Such a
biogas storage system can be fabricated from two plastic tanks or barrels,
having varying diameters, so that one barrel telescopes into the other one.
Yours
A.D.Karve
***********
It seems this idea would work best with a Batch-type process rather than a
continuous feed, am I correct? I bet I could set up several smaller tanks
in this manner and connect them to a manifold system whereby I could change
the tank supplying the fuel through the manifold as one tank empties and
another is producing.
What would be the safest / most effective psi for the pressure in the
lines? Would a regulator from scuba gear or maybe one for a propane tank
that hooks up to a gas grill be appropriate for measring the available psi?
Thanks!
-Donna (Utah)
---------------------------------
Want to start your own business? Learn how on Yahoo! Small Business.
------------------------------
_______________________________________________
Digestion mailing list
Digestion at listserv.repp.org
http://listserv.repp.org/mailman/listinfo/digestion_listserv.repp.org
End of Digestion Digest, Vol 7, Issue 3
***************************************
More information about the Digestion
mailing list