[Gasification] Biomass Position Available
JIRVING104 at aol.com
JIRVING104 at aol.com
Wed May 24 14:39:13 CDT 2006
We have an opening for a Senior Plant Engineer at the McNeil Generating
Station in Burlington Vermont. The McNeil Station is the largest wood fired
power plant in New England. It has been operating for 22 years, and has a
healthy outlook for the future. In addition to the usual plant engineer functions,
this position is responsible for the design and modifications for the
station control systems. The pay ranges from $45k to $74k depending on experience
and has a competitive benefit package. A job posting is available on
request. Please apply to:
Human Resources Dept
City of Burlington
131 Church Street
Burlington, Vt 05401
802-865-7145
_kcharles at ci.burlington.vt.us_ (mailto:kcharles at ci.burlington.vt.us)
Details on the McNeil Station are available at _www.burlingtonelectric.com_
(http://www.burlingtonelectric.com/)
Thanks, John Irving
More information about the Gasification
mailing list