[Gasification] Biomass Position Available

Peter Singfield snkm at btl.net
Wed May 24 15:24:40 CDT 2006



Hi John;

Peter from Belize checking in with you.

Is the McNeil station still burning wood -- or did it go ahead with
gasifying -- the burning the gas?

Peter

At 03:39 PM 5/24/2006 EDT, JIRVING104 at aol.com wrote:
> 
> 
>We have an opening for a Senior Plant Engineer at the McNeil  Generating 
>Station in Burlington Vermont.  The McNeil Station is the  largest wood
fired 
>power plant in New England.  It has been operating for  22 years, and has a 
>healthy outlook for the future.  In addition to the  usual plant engineer
functions, 
>this position is responsible for the design and  modifications for the 
>station control systems.  The pay ranges from $45k to  $74k depending on
experience 
>and has a competitive benefit package.  A job  posting is available on 
>request.  Please apply to:
> Human Resources Dept
>City of Burlington
>131 Church Street
>Burlington, Vt 05401
>802-865-7145
>_kcharles at ci.burlington.vt.us_ (mailto:kcharles at ci.burlington.vt.us) 
>Details on the McNeil Station are available at _www.burlingtonelectric.com_ 
>(http://www.burlingtonelectric.com/) 
> 
>Thanks,  John Irving
>
>
>_______________________________________________
>Gasification mailing list
>Gasification at listserv.repp.org
>http://listserv.repp.org/mailman/listinfo/gasification
>http://www.repp.org/discussiongroups/resources/gasification
>



More information about the Gasification mailing list